• Home
  • Supporting Documents
  • Pengalaman Kerja (current)
    Pengalaman kerja 2020 Pengalaman Kerja 2019 Pengalaman Kerja 2018 Pengalaman Kerja 2017 Pengalaman Kerja 2016 Pengalaman Kerja 2015 Pengalaman Kerja 2014 Pengalaman Kerja 2013 Pengalaman Kerja 2012 Pengalaman Kerja 2011 Pengalaman Kerja 2010
  • Gallery

Pengalaman Kerja 2016


1. PENINGKATAN PIPA PMK DAR DIAMETER 6” MENJADI DIAMETER 10” TERMASUK HYDRANT PILLAR DI TBBM SAMARINDA (AI.6F6.504)

2. PEKERJAAN PENGADAAN DAN PEMASANGAN MOV DI TBBM TARAKAN (AI.6F6.2016)

3. PENGADAAN TRANSPORTABLE GAS MONITOR DAN PORTABLE FIRE GROUND MONITOR (AI.6F6.902)

4. PEMBETONAN AREA JALUR TRUCK TANGKI DAN AREA KANTOR DI TBBM MAUMERE

5. PENGADAAN DAN PEMASANGAN 6 UNIT GEAR PUMP KAP. 300 GPM DI PRODUCTION UNIT CILACAP

6. PENINGGIAN PELATARAN LANTAI FILLING SHED EXISTING DAN PENATAAN PARIT DI SELURUH AREA TBBM BANJARMASIN (AI.6F6.507)

7. PEMASANGAN OVERFILL PROTECTION SYSTEM DI TANGKI PRODUK PT.PERTAMINA (PERSERO)

8. UPGRADING SARFAS PENGISIAN SKID TANK LPG DI TERMINAL LPG MANGGIS

9. PENGGANTIAN JARINGAN KABEL DAN PANEL POWER DI DEPOT LPG TG.PERAK

10. PERBAIKAN TANGKI TIMBUN NO.09 ‘DI TERMINAL BBM PANGKALAN BUN’ (AI.6F6.002)


PT. BINA BAHANA GEMILANG

TRADING COMPANY, ELECTRICAL MECHANICAL, GENERAL CONTRACTOR



© 2025 PT. Bina Bahana Gemilang  powered by Stratum Project